4 Installation4.1 Control panel assemblyThe instrument panel HMI GAS 310/610 ECO PRO is standard fittedin the Gas 310/610 ECO PRO boiler.4. Installati
5 Commissioning5.1 Switch on the instrument panelFor operation of the boiler Gas 610 ECO PRO:The features and instructions described are for each boil
5.2 Reading out measured valuesFor operation of the boiler Gas 610 ECO PRO:The features and instructions described are for each boilermodule.5.2.1. Re
5.2.2. Readout from the hour counter andpercentage of successful starts1. Press the two keys f simultaneously and then key [+] until thesymbol \ flash
State 5t Sub-status 5v3Burner for central heating operation30Temperature control31Limited temperature control (ΔT safety)32Output control33Increase pr
Parameter Description Adjustment rangeFactory settingGas 310 ECO PRO285 355 430 500 575 650p4Display screen0 = Simple1 = Comprehensive2 = Automatic sw
Parameter Description Adjustment rangeFactory settingGas 310 ECO PRO285 355 430 500 575 650p33Gas valve leak provingsystem VPS(Accessory)0 = Not conne
nBoiler type Gas 610 ECO PROParameter Description Adjustment rangeFactory settingGas 610 ECO PRO570 710 860 1000 1150 1300p1Flow temperature: TSET20
Parameter Description Adjustment rangeFactory settingGas 610 ECO PRO570 710 860 1000 1150 1300p29Minimum gas pressurecheck Gps(Accessory)0 = Not conne
5.3.2. Modification of the user-level parametersParameters p1 to p5 can be changed by the user.CAUTIONModification of the factory settings may be detr
Contents1 Introduction ...41.1 Symbols used ...
8. If necessary, set other parameters by selecting them using the[-] or [+] keys.9. Press the > key 2 times to return to the current operatingmode.
5.3.5. Return to the factory settingsCAUTIONBy restoring the factory settings, customized settings canalso be erased. So first write down all the cust
5.3.7. Setting the manual modeIn some cases it may be necessary to switch the boiler to manualoperation, For example, if the controller has not yet be
6 Troubleshooting6.1 Shutdowns and lock-outsFor operation of the boiler Gas 610 ECO PRO:The features and instructions described are for each boilermod
ShutdowncodeDescription Probable causes Checking / solution5v[4The maximum temperatureincrease speed tolerated inthe exchanger has beenexceeded4 Non-e
ShutdowncodeDescription Probable causes Checking / solution5v[22No flame during operation4 No ionization current4 Purge the gas supply to remove air4
ErrorcodeDescription Probable causes Checking / solutione[04e[054 Temperature of heatexchanger too low4 Exchangertemperature too high4 Bad connection4
ErrorcodeDescription Probable causes Checking / solutione[145 burner start-up failures4 No ignition4 Check cabling of ignition transformer4 Check the
ErrorcodeDescription Probable causes Checking / solutione[365x Flame loss4 No or insufficient ionizationcurrent4 Purge the gas supply to remove air4 C
6.2.1. Error readout memorised1. Press the two keys f simultaneously and then key [+] until thesymbol c flashes on the menu bar.2. Select the installe
6 Troubleshooting ...226.1 Shutdowns and lock-outs ...
6.2.2. Deletion of the error display1. Press the two keys f simultaneously and then key [+] until thesymbol c flashes on the menu bar.2. Select the in
Remeha Commercial UK - Part of the BDR THERMEARemeha HouseMolly Millars Lane WokinghamBerksRQ41 2QPAfter Sales Tel: 01189743076Technical Enquires: 011
3160514 - 125482-04
1 Introduction1.1 Symbols usedIn these instructions, various danger levels are employed to draw theuser’s attention to particular information. In so d
In the interest of customers, we are continuously endeavouring tomake improvements in product quality. All the specifications stated inthis document a
2 Safety instructions andrecommendations2.1 Safety instructionsStrictly follow the safety instructions given.WARNING4 This equipment operates using el
3 Technical description3.1 Control panelFor operation of the boiler Gas 610 ECO PRO:Each module has its own instrument panel.3.1.1. Functions of the k
3.1.2. Meaning of the symbols on the displayQInformation menu:Reading the various current values./On/Off switch (0/1):After 5 lock-outs, the boiler mu