Remeha Avanta Plus P520 Bedienerhandbuch

Stöbern Sie online oder laden Sie Bedienerhandbuch nach Nein Remeha Avanta Plus P520 herunter. Remeha Avanta Plus P520 Assembly Instructions Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken

Inhaltsverzeichnis

Seite 1 - Instructions

P 520Fuel oil/gas boilersRemehaAssembly Instructions300016864-001-CEN63118

Seite 2 - 1 Package list

10P 520 25/01/2012 - 300016864-001-C8` Fill the bottom of the W groove opposite the U groove for the intermediary parts (located on the periphery of t

Seite 3 - Control panel

1125/01/2012 - 300016864-001-C P 52010` Put the assembly tool in position.Tighten gradually so as to bring together the upper and lower connections ev

Seite 4

12P 520 25/01/2012 - 300016864-001-C12` Trim off any projecting ends of the thermocords the sweeping covers.13 Fitting the upper and lower assembly ro

Seite 5 - 2 Mounting

1325/01/2012 - 300016864-001-C P 52014RearFront` Put in place the upper assembly rods in the two front and rear lugs.` Mount the 2 crosspieces (su

Seite 6

14P 520 25/01/2012 - 300016864-001-C15 Assembling the side assembly rods- The side assembly rods must be assembled from the rear tothe front.- The ro

Seite 7 - 00 8M00 5

1525/01/2012 - 300016864-001-C P 520RearFrontBBBBEA A E520 mm520 mm520 mm420 mm520 mm520 mm520 mm520 mm420 mm520 mm520 mm520 mm520 mm

Seite 8

16P 520 25/01/2012 - 300016864-001-C16 Assembling the pocket and the plugsSafety pressure sensitive switchAssembling the safety pressure sensitive

Seite 9

1725/01/2012 - 300016864-001-C P 52017 Fitting the upper and lower front flanges` Fit the plain flange onto the upper connection of the front section

Seite 10

18P 520 25/01/2012 - 300016864-001-C2.Ensure that all the air in the boiler is vented to avoid any bursting of the body.3.` Maintain pressure for at

Seite 11

1925/01/2012 - 300016864-001-C P 52019 Assembling the baffle plates` Put the baffle plates into place in the upper front flue ways, taking care to int

Seite 12 - M06000 8

2P 520 25/01/2012 - 300016864-001-C1 Package list` Before starting to assemble the boiler, refer to the table below to check if you have received all

Seite 13

20P 520 25/01/2012 - 300016864-001-C20 Assembling the sweeping coversRearFront- Clean off the protective varnish on the ground surfaces withdiluen

Seite 14

2125/01/2012 - 300016864-001-C P 52021` Insert the thermocord in the sealing groove on each side and hold it in place with a few drops of silicone fil

Seite 15

22P 520 25/01/2012 - 300016864-001-C23 Burner door2 screws SIM 3.94x25.4Refractory feltRigid refractory plate` Put the furnace door insulating m

Seite 16 - P520-21/23/25

2325/01/2012 - 300016864-001-C P 52025 Fitting the furnace door` Fit the door onto the hinge by inserting the pin.` Close the furnace door on the 8 st

Seite 17 - 18 Hydraulic test

24P 520 25/01/2012 - 300016864-001-C27 Flame inspection window` The flame inspection window is fitted with a 1/4" tapped hole for ventilation (op

Seite 18 - 078M0 00

2525/01/2012 - 300016864-001-C P 520• P 520-15 to P 520-25` Fit the water balancing tube onto the boiler return with a Ø 170x222 gasket in between (fi

Seite 19 - Total number of baffle 4 6 8

26P 520 25/01/2012 - 300016864-001-C30 Fitting the boiler outlet flange` Carefully insert the Ø 15 gasket in the groove of the rear section and hold i

Seite 20

2725/01/2012 - 300016864-001-C P 52032` The flue gas outlet is fastened to the rear by means of 6 studs, washers and Ø 12 nuts.33` First adapt the ste

Seite 21

28P 520 25/01/2012 - 300016864-001-C34 Assembling the flow switch` Fasten the flow switch on the sleeve tube. The direction of the arrow head on the c

Seite 22 - 23 Burner door

2925/01/2012 - 300016864-001-C P 52035 Assembling the baffle plates Boilers supplied with an assembled bodyfor boilers supplied with an assembled bod

Seite 23 - 25 Fitting the furnace door

325/01/2012 - 300016864-001-C P 520 Baffle plates Casing fittings Casing, variable parts Insulating material for body Control panelBoiler P 520 -

Seite 24 - 27 Flame inspection window

30P 520 25/01/2012 - 300016864-001-C37 Assembling the top insulating material - 13 to 17 sectionsPackage FA34 to FA41Front- Put in place the 600 mm

Seite 25 - M000091-B

3125/01/2012 - 300016864-001-C P 52039 Assembling the top insulating material - 19 to 25 sectionsPackage FA37, FA39, FA40, FA41` Put in place the 2 pi

Seite 26

32P 520 25/01/2012 - 300016864-001-C41 Assembling the cable channels - 19 to 25 sectionsPackage FA16 and Package FA18, FA20, FA22, FA24Package FA16

Seite 27

3325/01/2012 - 300016864-001-C P 52043 Assembling the lower rail support bracketspackage RC2 or RC3 Example for a P 520-13` Fasten the lower rail sup

Seite 28 - 34 Assembling the flow switch

34P 520 25/01/2012 - 300016864-001-C Assembly direction of lower rail support brackets(seen from the top of the frame)A: 13, 15 and 17 sectionsB: 19

Seite 29

3525/01/2012 - 300016864-001-C P 52044Frontsee fig. 46` Fasten the lower rail with H8 x 30 screws and L8 washers.` The other rail support brackets

Seite 30 - Package FA23, FA25, FA27

36P 520 25/01/2012 - 300016864-001-C46 Installing the insulating material - Package FA34 to FA41Front` Place the side insulating material against th

Seite 31 - Package RC3

3725/01/2012 - 300016864-001-C P 52047 Example with P 520-17Rear Front13 to 17 sections` Fix the upper rail with H8 x 30 screws and L8 washers (

Seite 32

38P 520 25/01/2012 - 300016864-001-C48 Assembling the side casing panelsPackage FA142 to FA143 and FA10 to FA11` First assemble the panels on the fron

Seite 33 - Example for a P 520-13

3925/01/2012 - 300016864-001-C P 52049 Assembling the furnace door and lower crosspiece panelspackage RC2 or RC3Put the furnace door panel in place

Seite 34

4P 520 25/01/2012 - 300016864-001-C Accessories - Available as an optionRefer to the applicable price list for the other optional features (control

Seite 35 - Package RC2 and RC3

40P 520 25/01/2012 - 300016864-001-C51 package RC2 or RC3` Put the front crosspiece in place (package RC2 or RC3) and fasten with 2 screws (H8x16) and

Seite 36

4125/01/2012 - 300016864-001-C P 52052 Package RC6

Seite 37

42P 520 25/01/2012 - 300016864-001-C53 Control panel assemblyPosition the control panel on the front studs.Open the control panel (2 screws on the

Seite 38 - 01M00 1 1

4325/01/2012 - 300016864-001-C P 52055 Installing the bulbs` Fix the control panel to the rear of the control panel bracket using 2 screws (H Ø 4 x 40

Seite 39 - 1M000 12

44P 520 25/01/2012 - 300016864-001-C58 Installing the insulating material` Put in place the insulating material as shown above.59 Section A-A: package

Seite 40 - 51 package RC2 or RC3

4525/01/2012 - 300016864-001-C P 52060 package RC2 or RC3` Fix the trim to the control panel using 2 tapping screws and serrated washers.61 package RC

Seite 41 - 52 Package RC6

46P 520 25/01/2012 - 300016864-001-C62 package RC2 or RC3` Fit the left and right-hand side front panels (package RC2 or RC3) onto the lower front cro

Seite 42 - 54 Burner cable

4725/01/2012 - 300016864-001-C P 52064 package RC2 or RC3` Put in place the insulation of the flue gas box and the lower rear insulating material (pac

Seite 43 - 55 Installing the bulbs

48P 520 25/01/2012 - 300016864-001-C66 package RC2 or RC3` Put the 2 clip-on nuts in place on the side panels .` Fit the upper rear panel (package RC

Seite 44

4925/01/2012 - 300016864-001-C P 52068 Assembling the central plate for 19 to 25 sectionsPackage FA18, FA20, FA22, FA24Package RC3Package FA16`

Seite 45 - 61 package RC2 or RC3

525/01/2012 - 300016864-001-C P 5202 MountingWarning: Assemble the boiler in the order given by the numbers of each figure, in compliance with all t

Seite 46 - 63 package RC2 or RC3

50P 520 25/01/2012 - 300016864-001-C70Package MR4 to MR5Package FA10 to FA11` Place the side covers (package FA7 to FA11, see table) from the fron

Seite 47 - 65 package RC2 or RC3

5125/01/2012 - 300016864-001-C P 52071 Data plate` Glue the rating plate and CE marking on the casing of the boiler in an easily visible location.M000

Seite 48 - M0 70012

© CopyrightAll technical and technological information contained in these technical instructions, as well as anydrawings and technical descriptions su

Seite 49 - 69 Package FA34 to FA41

6P 520 25/01/2012 - 300016864-001-C1` to : Assembly of the base frame, delivered unassembled.` Place the frame on the floor, taking care to note the

Seite 50 - Package FA10 to FA11

725/01/2012 - 300016864-001-C P 5202` Establish the location of the frame on the basis of the opening direction of the furnace door and the length of

Seite 51 - 71 Data plate

8P 520 25/01/2012 - 300016864-001-C4` Fill the bottom of the U groove (located on the periphery of the section) with a continuous bead of DOW CORNING

Seite 52 - 300016864- 001- C

925/01/2012 - 300016864-001-C P 5206Handle the nipples with gloves, there might be sharpedges.Clean the bores and nipples with diluent.Remove any t

Kommentare zu diesen Handbüchern

Keine Kommentare